ICBA GRID-CONNECTED SOLAR PV SYSTEM PROJECT

In line with ICBA’s objective of increasing environmental sustainability and cost efficiencies, ICBA
would like to generate clean renewable electricity from the sun. ICBA seeks written proposal from
qualified vendors to install a solar PV grid-tied system to power ICBA facilities and enter into a lease
contract for the usage of generated power.

ICBA wants a solar electric system to decrease electric bill and be protected against future utility rate
increases by getting all the electricity directly from the sun, which never sends a bill to DEWA.
ICBA would like to generate from the solar system approximately 1,300,000 kWh/year, without
burning fuel or emitting greenhouse gases and other pollutants.

ICBA Location:
Location: United Arab Emirates-Dubai.
Latitude: 25.0947
Longitude: 55.389

Proposal Submission Deadline: 
Sunday, December 8, 2019 - 23:59